What Is a Draw Schedule?

    Rehab & FlippingDeal math & underwriting3 related termsPlaybook · numbers · legal

    The short answer

    A plan for paying rehab money in stages as work is finished.

    What it means

    A draw schedule splits the repair budget into payments released when specific milestones are complete, such as demo, rough-in inspection, drywall and final. Hard money and private lenders use it to fund rehab money only after an inspector confirms the work. Investors use the same idea with contractors, so they never pay ahead of progress. It protects everyone from paying for work that isn't done. A clear schedule also speeds up the job, because the contractor knows exactly what unlocks the next payment.

    Real deal example

    Draw 1 demo/roof 25%, Draw 2 rough-ins passed 30%, Draw 3 drywall & cabinets 25%, Draw 4 final 20%.

    Why it matters to wholesalers

    Flip profit is decided by the purchase price and the rehab plan. Knowing these terms helps you price risk before you make an offer.

    The operator's playbook

    Ask your lender how long draws take to fund. A 5–7 day turnaround on each of five draws can add a month to your project.

    Many investors fund the first phase from their own cash so the contractor starts immediately, then get reimbursed in Draw 1.

    Keep retainage (5–10%) until the punch list is signed off — it's your leverage to get the last details finished.

    Before signing with a contractor, review their experience with draw schedules. Ask for references and confirm they are comfortable with a phased payment system and understand the importance of timely requests and documentation.

    Align your contractor's draw schedule with your lender's requirements. Some lenders have specific forms or inspection procedures, so ensure your contractor is aware of these to avoid delays in funding subsequent phases.

    Establish clear criteria for each draw milestone before work begins. This means defining what 'rough-in inspection passed' or 'drywall hung and taped' specifically entails, often including photo documentation and relevant permits signed off.

    Develop a communication protocol with your contractor for draw requests. Specify who submits the request, what documentation is needed (e.g., invoices, lien waivers from subs), and the expected turnaround time for their submission.

    Upon receiving a draw request, verify that all work for that milestone is genuinely complete to satisfaction and all required documentation is included. This might involve a site visit or review of inspection reports before approving the release of funds.

    For larger rehabs, consider a dedicated rehab escrow account managed by a third party. This can streamline the payment process, as the escrow company handles the release of funds based on approved draw requests and lender instructions, adding an extra layer of financial security.

    By the numbers
    Typical number of draws
    4–6
    Lender inspection fee
    $100–$250 each
    Retainage
    5–10%
    Typical first draw percentage (materials/mobilization)
    10-20%
    Typical final draw percentage (after punch list)
    5-10%
    Standard lender processing time for draws
    3-7 business days
    Estimated total cost for a full set of draw inspections (5 draws)
    $500-$1,250
    Legal and title watch-outs

    Draws you pay without lien waivers leave you exposed to subcontractor liens even though you paid the GC.

    General information, not legal advice. Rules vary by state.

    Pro tips from the deal desk
    • Photograph each milestone before requesting a draw.
    • Keep draw requests to round, clear milestones.
    • Know your lender's draw cut-off day.
    • Always get partial lien waivers from the GC and any significant subcontractors for the amount of work completed and paid for in each draw.
    • Walk the property with your contractor and inspector to ensure everyone agrees on the completion of a milestone before a draw request is submitted.
    • Build a contingency budget into your project specifically for unexpected costs that might arise between draws.
    • Familiarize yourself with state-specific requirements regarding contractor payments and lien laws to ensure compliance.
    How to work it out
    1. 1Match draws to inspectable milestones.
    2. 2Agree the inspection process with your lender.
    3. 3Collect lien waivers each draw.
    4. 4Hold back 5–10% until punch list is done.
    Common mistake

    Agreeing to a schedule with too few draws, which forces contractors to float costs and slows the job.

    How DispoKey handles it

    Every DispoKey marketplace deal shows ARV, a repair estimate, comps and systems ages so you can run your own numbers fast.

    Browse marketplace deals

    Questions about Draw Schedule

    What is Draw Schedule in real estate investing?

    A plan for paying rehab money in stages as work is finished. A draw schedule splits the repair budget into payments released when specific milestones are complete, such as demo, rough-in inspection, drywall and final. Hard money and private lenders use it to fund rehab money only after an inspector confirms the work. Investors use the same idea with contractors, so they never pay ahead of progress. It protects everyone from paying for work that isn't done. A clear schedule also speeds up the job, because the contractor knows exactly what unlocks the next payment.

    Why does Draw Schedule matter to investors?

    Flip profit is decided by the purchase price and the rehab plan. Knowing these terms helps you price risk before you make an offer.

    What's the most common mistake with Draw Schedule?

    Agreeing to a schedule with too few draws, which forces contractors to float costs and slows the job.

    Are there legal risks with Draw Schedule?

    Draws you pay without lien waivers leave you exposed to subcontractor liens even though you paid the GC.

    What is a draw schedule in real estate investing?

    A draw schedule is a plan for releasing renovation loan funds in stages as work progresses. Instead of receiving the full rehab budget upfront, a fix-and-flip or buy-and-hold investor receives payments, called draws, tied to project milestones. It helps the lender track progress and helps the investor plan cash flow.

    How does a construction or rehab loan draw schedule work?

    The lender and borrower typically agree on a renovation budget and milestones before work begins. When a stage is complete, the borrower requests a draw, and the lender may review invoices or inspect the property before releasing funds. Some loans offer an initial advance, while others reimburse completed work, so check the terms before scheduling contractors.

    What should be included in a rehab draw schedule?

    A useful draw schedule lists each phase of work, its budget, the requirements for payment, and the expected timing. For example, a project might have separate draws for demolition, rough plumbing and electrical, interior finishes, and final completion. Include any required inspections, draw fees, or funds held back until completion so you can budget more accurately.

    How can draw schedule delays affect a fix-and-flip or rental property deal?

    Delayed draws can leave you covering labor and materials out of pocket, potentially slowing the rehab and increasing holding costs. When evaluating an off-market deal on DispoKey, factor your lender's draw process into your renovation timeline and cash reserves. Ask about inspection turnaround times and required paperwork before closing; permit and lien-related requirements can vary by state and locality.